Prairie Village · Mission Hills · KC Metro

Coated. Stained. Sealed.

I grind, coat and seal existing concrete. I do not pour it.

2 DaysOn site, most garages
48 HrsUntil you park on it
24 HrsQuote in your inbox
InsuredKS & MO
  • Garage Floor Coatings
  • Driveway & Patio Sealing
  • Stained & Polished Concrete
5.0 18 Google reviews · KC metro
Joe Faerber of Prime Pavement KC

Joe Faerber

Stamped patio restored in Stilwell, KSStilwell · Stamped Patio Close-up of gray, white and black vinyl flake set in a gloss garage floor coatingFull Flake · Epoxy Detail Before and after of a two car garage floor coated in Prairie Village, KSPrairie Village · Garage Coating Water beading on freshly sealed concrete, proof the penetrating sealer is workingSealed · Water Beading

What We Do

Services / 01-03
01

Floor Coatings

Diamond-ground epoxy and polyaspartic floors, bonded into the slab so they do not peel off it.

Two days on site · Back in service in 48 hours

02

Concrete Sealing

A penetrating sealer that blocks water, salt and freeze-thaw without changing how the concrete looks.

Reseal every 2 to 5 years

03

Stained & Polished

Color that reacts into the slab instead of sitting on top, so there is no layer to peel.

No coating to peel or reapply

See every service →

What's Actually On Your Floor

Four layers / two days
Cross section of a Prime Pavement garage floor coating Four stacked layers from the bottom up: a diamond ground slab, a PLE-100 epoxy basecoat, a broadcast vinyl flake layer, and an RG-80X polyaspartic topcoat applied after a 12 hour cure. 12 HR CURE 04 03 02 01
  1. 04

    Polyaspartic Topcoat

    RG-80X at 80 percent solids. UV stable, so it will not amber the way a bare epoxy topcoat does. Foot traffic the next morning, vehicles at 48 hours.

  2. 03

    Vinyl Flake

    Torginol flake, hand broadcast into the wet basecoat until the floor will not take any more. Roughly 25 pounds per 100 square feet. It carries the color and the grip, and it hides dust.

  3. 02

    Epoxy Basecoat

    PLE-100, 100 percent solids, squeegeed and back rolled at 8 to 16 mils. The manufacturer requires 12 hours before anything goes over it. That is the reason your garage takes two days instead of one.

  4. 01

    Prepared Slab

    Diamond ground to a CSP-2 profile, cracks and spalls filled and ground flush. The coating keys into the concrete instead of sitting on top of it, which is why it does not peel up with a hot tire.

Before & After

Real jobs / KC metro
Before and after of a garage floor in Prairie Village, KS, scuffed grey concrete before and a light grey full flake coating after, shot from the driveway with the door open Before / After
Garage floor coated · Prairie Village
Before and after of a red stamped concrete patio in Overland Park, KS, faded and dusty before, rich and sealed after Before / After
Stamped patio sealed · Overland Park
Before and after of a garage floor coating in Kansas City, MO, stained concrete with peeling paint and a crack on the left, gray and white full-flake epoxy floor on the right Before / After
Garage floor coated · Kansas City
Before and after of a two car garage floor in Prairie Village, KS, scuffed tire-marked concrete before and a gray full flake coating after Before / After
Garage floor coated · Prairie Village
Before and after of a basement floor in Overland Park, KS, cluttered bare concrete before and a clean glossy sand tan epoxy floor after Before / After
Basement floor coated · Overland Park
See The Full Gallery →
5.0 Google rating, 19 reviews
24hr To a written quote, in your inbox
2 Days on site for most garages
48hr Until you can park on it again
Joe Faerber, owner of Prime Pavement KC

Locally owned · Joe Faerber

"You call, you get me. Not a receptionist, not a rep working on commission."

I started out sealing driveways. Most of what I do now is floors, garages and basements and the occasional commercial job, but it is the same operation it always was. Small on purpose.

On the bigger floors I bring in a second set of hands. Same guy every time, not a rotating crew you have never met.

The part people do not expect is that I will talk you out of work. If your slab is not a good candidate, or what you are asking for will not do what you want it to do, I would rather say so up front than take the money and be back next year looking at a floor that failed.

Insured Free Quotes Quotes In 24 Hours

How It Works

Simple / fast
Step 01

Reach Out

Form or phone. Tell us about your concrete. Takes about a minute.

Step 02

Get A Straight Quote

We assess the surface and give you one clear number. No guesswork, no hidden fees.

Step 03

We Schedule

Pick a date that works. We confirm everything before we show up.

Step 04

Done Right

On time, clean work, and your concrete noticeably cleaner and fully protected.

KC Trusts Us

5.0 · Google Reviews
★★★★★

"One of the best experiences with hiring someone for a home project. Joe is most pleasant to work with. He explains the process and is very informative with any questions."

Carol Flood · Google Review
★★★★★

"Just had the pleasure of working with Joe and his team. They did some incredible work, and we introduced him to our neighbors to have similar work done."

Shea Callahan · Google Review
★★★★★

"I would recommend Prime Pavement KC without hesitation. Joe responded timely to my request for an estimate and communicated clearly and professionally throughout the process. Our driveway looks fantastic!"

Christopher Brown · Google Review
★★★★★

"If you're looking for someone who actually takes pride in their work, this is your guy. Professional, responsive, and goes the extra mile to make sure everything is done right."

Lucas Clark · Google Review
★★★★★

"Joe was a pleasure to work with and did a fantastic job cleaning and sealing our patio. I would highly recommend this business."

David Emerick · Google Review
★★★★★

"Prime Pavement was easy to work with and provided high quality services. Joe was very communicative and provided updates throughout the work."

Jeff Randolph · Google Review
Read All 18 Reviews on Google Review Us on Google

Where We Work

50-mile radius / KC metro
Overland Park Olathe Lenexa Shawnee Leawood Prairie Village Mission Fairway Stilwell Lee's Summit Independence Blue Springs Liberty Kansas City MO

Questions

The stuff everyone asks
Will sealing change how my driveway looks?+
No. We use a clear penetrating sealer that soaks into the concrete and leaves the surface looking exactly the same. No glossy shine, no wet look, no film. It protects from within.
Is pressure washing included with sealing?+
Yes. The sealer needs clean concrete to bond properly, so every sealing job includes a full professional pressure wash first. It's part of doing the job right.
How much does it cost?+
It depends on the size and condition of your concrete, which is why quotes are free and tailored to your property. No guesswork, no hidden fees. What we quote is what you pay.
How long does a job take?+
Most driveways take two days: we wash on day one, let the slab dry completely, and seal on day two. A dry slab lets the sealer soak in deeper and last longer. Garage floor coatings take two days: the epoxy basecoat needs 12 hours to cure before the polyaspartic topcoat can go over it. We confirm the timeline with your quote.

Instant estimate · No pressure · Owner replies personally

Let's Protect
Your Concrete.

(913) 286-7587

We typically respond within a few hours during business days.

Call Joe Free Quote